FSSC 22000 version 6 is the edition of the scheme certification bodies now audit against, and its supplier management expectations sit in the Foundation's additional requirements rather than in ISO 22000 itself. This page explains what those requirements ask a plant to hold on each supplier, what tightened in practice, and where the certificate paperwork usually comes apart.

FSSC 22000 v6 supplier management, defined

FSSC 22000 version 6 supplier management is the set of scheme requirements that oblige a certified plant to approve its suppliers of materials and services against defined criteria, to hold the evidence of that approval, and to keep monitoring each supplier after approval rather than only at onboarding. In document terms, it is the reason your file carries an allergen declaration, a certificate of analysis and a third party audit certificate for each supplier, and the reason an auditor checks whether each one is still in date.

The scheme is ISO 22000, plus a sector prerequisite programme specification, plus the Foundation's own additional requirements. Supplier management is handled mainly in that third layer, which is why a plant that knows ISO 22000 well can still be caught out. The published version 6 scheme documents are the only authority on the exact clause wording, and your certification body audits against that wording, so treat what follows as a practical reading rather than a substitute for it.

An example

A plant buys from 60 raw material and packaging suppliers. Approval is documented for all 60. The auditor samples six and asks for the current evidence behind each one. Five are fine. The sixth has an audit certificate that expired seven weeks ago. The supplier renewed it in the meantime, but never sent it across and was never asked. Nothing about the material was unsafe. The finding is still written up, because the control the plant described in its own procedure was not operating, and a corrective action is now due inside the certification body's deadline.

What version 6 tightened in practice

Version 6 did not invent supplier management. It tightened the parts of it that were easiest to run informally. Three shifts matter for the paperwork, and all three are worth checking against the clause text in the current scheme documents before you rewrite a procedure.

  • Approval has to be a described process, not a habit. The criteria, who decides, and what evidence is held, written down, and then applied to every supplier in scope rather than to the ones you remember.
  • Monitoring continues after approval. Review on a defined frequency, with the record of that review kept, so a supplier approved three years ago cannot sit unexamined on the approved supplier list because nothing has gone wrong yet.
  • Exceptions belong inside the system. Emergency purchasing and any supplier used outside the normal route need a defined path and a record. An auditor will look for the one delivery that bypassed the list.

Every one of those turns, at the audit table, into a request for a document with a date on it. That is where most mid-market plants lose marks. The procedure reads well, the sample is pulled, and the certificates behind it are three months stale because chasing 60 suppliers by email sits at the bottom of someone's week.

Related terms

  • Approved supplier list. The register of suppliers cleared to supply you, and the thing the version 6 requirement is ultimately asking you to keep honest.
  • Document control. The wider discipline of knowing which version of a document is current and who holds it. Supplier certificates are document control applied to paper you do not author. There is a separate page on this.
  • Certificate of analysis. A per batch or per product analytical record from the supplier, usually the certificate type that goes stale fastest.
  • Allergen declaration. The supplier's written statement of allergens present and handled on their site, and the document most often requested first in an allergen trace.
  • Non-conformance. The finding an auditor raises when evidence is missing or out of date, graded major or minor. There is a separate page on how the two differ.
  • Corrective action. What you do, and record, to close out that finding inside the deadline. Covered on its own page.
  • Unannounced audit. The audit route that removes the preparation window entirely, which is why the status of your supplier file matters on an ordinary Tuesday.

Questions

Where do the version 6 supplier management requirements actually sit?

In the Foundation's additional requirements layer of the scheme, which sits alongside ISO 22000 and the sector prerequisite programme specification. Read the published version 6 scheme documents at fssc.com for the clause wording your certification body will audit against.

Which supplier documents should I expect to be date-checked?

In practice, the third party audit certificate, the allergen declaration and the certificate of analysis are the three an auditor reaches for first, because each carries an expiry or issue date that is quick to test against today's date.

Is a spreadsheet enough to meet the requirement?

A spreadsheet can hold the right information. The failure mode is not the format, it is that nobody looks at it between audits, so expiry dates pass unnoticed and the chase email never goes out. Whatever you use has to surface what is about to lapse without being asked.

Does FSSC 22000 version 6 require software?

No. The scheme asks for a defined process and the records that show it operated. Software is one way of keeping those records current, not a requirement of the standard.

Does Certly make our plant FSSC 22000 compliant?

No, and the product says so on screen. It is a certificate tracking and reminder system: it shows each supplier's certificates as current, expiring soon, expired or missing, and a persistent disclaimer states that it does not verify certificate authenticity or guarantee regulatory compliance. The judgement about compliance stays with your QA team and your certification body.

Sources

Tell us how you track certificates today

If you keep supplier certificates in a spreadsheet and chase them by email, we want the details: your standard, your supplier count, and the part of the chase that wastes the most time.

One email when it launches, and the occasional update. Unsubscribe any time. Privacy.